Every job, with its safety steps, from issue to sign-off.
Breakdowns, PM tasks and AI warnings all become work orders with a technician, priority, parts, lockout-tagout steps and a closing checklist. Time and parts are logged as the job happens, so the cost of every repair is known.
Inside Work Orders
Lockout-tagout built in
Each machine carries its own isolation points and LOTO steps. They attach to every job automatically.
No close without safety
A job cannot be closed until the safety checklist and lock removal are signed off.
Assign by skill and shift
Electrical, mechanical, utility. Assign to the right trade on the right shift, or let Hungpang suggest.
Time on tools
Start, pause and finish from the phone. Waiting for parts and waiting for permits are tracked separately.
Parts issued to the job
Spares are issued against the work order, so stock and repair cost update together.
Permit to work
Hot work, height work and confined space permits linked to the job, with approver sign-off.
How it runs on your floor
- Step 1Raise
From a breakdown, PM plan, AI warning or by hand.
- Step 2Prepare
Parts reserved, LOTO steps and permits attached.
- Step 3Work
Technician logs time, readings, photos and parts.
- Step 4Close
Safety checklist signed, production confirms restart.
Safety rules on every job
- Every work order includes the plant's lockout-tagout and safety steps for that machine.
- Jobs cannot be closed until the safety checklist is complete and locks are removed.
- Permits to work need approver sign-off before the job can start.
- Hungpang never energises, starts or stops equipment.
About Work Orders
Can contractors use work orders?
Yes. Give AMC vendors a limited login to see their jobs, log time and upload service reports.
Who can close a job?
You decide. Typically the technician completes, the maintenance head closes, and production confirms the restart.
The rest of the panel
Turn the key. Run the line.
Try Hungpang free for 30 days on up to 50 machines. Tag your first machine today and your operators can report a breakdown before the shift ends.
No card needed · Setup in a day · Cancel anytime
